| Pro:type | Programme | Time | Crew | Equipment | Equipment |
| Studio | In house | Hiring | |||
| Studio 2 | C- | ||||
| CA/L- | |||||
| VM.- AM- | |||||
| Studio 3 | C- | ||||
| CA/L- | |||||
| VM.- AM- | |||||
| Studio | DREAM STAR SEASON 11 | 15.00 | L.D-Sarath | ||
| Narahen: | C-Susantha /Ruwan /Suresh Laxman /Manjula /Upul /Jagath | ||||
| Jimi jib C-Prasad A-Sanka Shamal | |||||
| LED W-Tiron | |||||
| CA/L-Ishara /Nalinda /Dasun Thilina /Wishwa | |||||
| Crane 3 C-Saman A-Damith | |||||
| Studio | LD- | ||||
| Delkanda | C- | ||||
| Jimi jib- | |||||
| LED W- | |||||
| CA/L | |||||
| Crane 3-C | |||||
| E.F.P. | C- | ||||
| C.A- | |||||
| R- | |||||
| A- | |||||
| C- | |||||
| C.A- | |||||
| R- | |||||
| OB | PERAHERA @ MALABE | 09.00 | L.D-Sarath /Sirimal | HMI 1.8kw-02 575w-02 | PXW 200 multi set up |
| C-Sriyantha /Lakmal /Hiring-02 | 2kw-02 /1kw-08 | Mini Crain | |||
| CA/L-Kasun /Janaka /Lalantha | Led li-02 | 60kw Genarator | |||
| CA/L-Danuska /Kuruppu | Rosterm set-02 | ||||
| CA/L-Upul /Pasindu Chathuranga | |||||
| VM- Am- | |||||
| EFP C-Hiring A-Upul /Hiring | |||||
| Pre pro: | L.D- | ||||
| C- |
Wednesday, June 28, 2023
Saturday 01st July 2023
| Pro:type | Programme | Time | Crew | Equipment | Equipment |
| Studio | In house | Hiring | |||
| Studio 2 | C- | ||||
| CA/L- | |||||
| VM.- AM- | |||||
| Studio 3 | C- | ||||
| CA/L- | |||||
| VM.- AM- | |||||
| Studio | DREAM STAR SEASON 11 | 15.00 | L.D-Sarath | ||
| Narahen: | C-Susantha /Sirimal /Ruwan Suresh /Laxman /Manjula /Upul | ||||
| Jimi jib C-Prasad A-Sanka Shamal | |||||
| LED W-Tiron | |||||
| CA/L-Ishara /Nalinda /Dasun Danuska /Upul | |||||
| Crane 3 C-Saman A-Damith | |||||
| Studio | LD- | ||||
| Delkanda | C- | ||||
| Jimi jib- | |||||
| LED W- | |||||
| CA/L | |||||
| Crane 3-C | |||||
| E.F.P. | C- | ||||
| C.A- | |||||
| R- | |||||
| A- | |||||
| C- | |||||
| C.A- | |||||
| R- | |||||
| pro: | L.D- | ||||
| C- |
Subscribe to:
Comments (Atom)